top of page

The Impact of Prolonged Sitting on Low Back Pain: Exploring the Link to Physical Activity

Apr 4, 2023
2 min read

Updated: Jun 20, 2024

The Impact of Prolonged Sitting on Low Back Pain: Exploring the Link to Physical Activity

Association between physical activity and sitting too long leading to low back pain
Association between physical activity and sitting too long leading to low back pain

Low back pain is one of the BIGGEST health issues GLOBALLY


It can start off as an acute short lasting painful episode or it can become a chronic lifelong problem for many people.


Research from 2023 looked into whether our lifestyle can predict the trajectory of low back pain


If you remember from other blogs, research shows we should be aiming for UNDER 6 hours a day of sitting, but as a society we are averaging over 55% of our day sitting!


The research concluded that people with a LIFETIME history of low back pain, engagement in HIGHER volume of moderate to VIGOROUS intensity physical activity where likely to have a LOWER probability of developing a SEVERE trajectory over one year


They discovered that for every one minute increase in moderate to vigorous intensity activity per week had a 2.8% reduction in a participants probability to having a severe low back pain trajectory.


There was NO associations between sedentary behaviour and LIGHT INTENSITY physical activity improving low back pain trajectory



If you want more information about how we can help . Please call Health Wise Chiropractic 03 9467 7889 or book online to see one of our Chiropractors in Sunbury or Melton/Strathtulloh Today!



Chiropractic has moved online. We offer our online programs -STAND CORRECTED- To help you through the day. They contain health advice for your conditions, nutritional advice and exercises for you to do at home or at the workplace to help you achieve your health goals. We understand that coming to the Chiropractic clinic maybe costly and time consuming. This way if you cant make it into the chiropractic office, you can do any of our 20+ online health programs at your leisure.

Enjoy and we hope they spark a little bit of joy and help you achieve your health goals. Each program contains - Information about the conditions - things to do and things to avoid - nutrition advice - all the stretches that are needed to help The following conditions are now available for online sessions

  • migraine

  • cervicogenic headaches

  • cervical facet neck pain

  • tension headaches

  • cervical radiculopathy (pins and needles in the arm originating from the neck)

  • shoulder impingement relief

  • thoracic outlet syndrome

  • frozen shoulder

  • rotator cuff

  • chronic lumbar (Low Back) disc pain

  • acute Lumbar(low back) disc pain

  • Lumbar facet pain

  • sciatica and piriformis syndrome

  • meniscus (knee pain)

  • Plantar fasciitis (Foot Pain)

  • Shin Splints

  • Tennis Elbow/Golfers elbow

  • Carpal tunnel Syndrome

  • Upper Crossed Syndrome( Poor Posture)

  • Lower Crossed Syndrome ( Poor Posture)

  • Dizziness-Vertigo

  • Arthritis

  • Welcome To Chiropractic

  • TMJ (Jaw Pain)

Reference


Spine J . 2023 Mar 20;S1529-9430(23)00110-9. doi: 10.1016/j.spinee.2023.03.006. Online ahead of print.

Association between physical activity, sedentary behaviour and the trajectory of low back pain

Comments


Clinic Tour 

Our Location Details 

Melton/Strathtulloh Chiropractor

 

 

Health Wise Chiropractic Melton: Located at 131 Wembley Avenue, Strathtulloh VIC 3338. Conveniently serving Melton, Aintree, and Cobblebank with after-hours and weekend availability.

  • Instagram
  • Facebook
  • YouTube

131 Wembley Avenue ​

Strathtulloh- Melton

Ph: 03 9467 7889

​

Areas Serviced 

Melton 

Cobblebank 

Strathtulloh 

Weir Views 

Thornhill Park 

Eyensbury 

Rockbank 

Aintree 

​

​

Monday

7.00 Until 8.00pm

​

Tuesday

7.00 Until 8.00

​

Thursday

7.00 Until 8.00pm

​

Saturday 8.00am until Lunch 

​

Sunday Appointment Only 

Sunbury Chiropractor 

 

 

Health Wise Chiropractic Sunbury: Located at 21 Powlett Street, Sunbury VIC 3429. Featuring on-site private parking and 4 dedicated treatment rooms serving the Macedon Ranges.

  • Instagram
  • Facebook
  • YouTube

21 Powlett Street

Sunbury Vic 3429

​

Ph: 039467 7889

​

Areas Serviced 

Sunbury 

Diggers Rest 

Romsey 

Riddells Creek 

Bulla

​

Opening Hours: (updated August 2026)

​

Monday 

9.30AM Until 6.30PM

​

Tuesday

8.00AM Until 6.30PM

​

Wednesday 

8.00AM Until 7.00PM

​

Thursday 

8.00AM Until 6.30PM

​

Friday 

8.00AM Until 7.00PM

​​

Saturday:

8.00am Until 12.00pm

 

Sunday: Home Clinic 

​

For Terms and Conditions click here 

  • White Facebook Icon

Medical Disclaimer & Terms of Use Educational Content Only: All information, text, graphics, images, blogs, and other material contained on this website (collectively referred to as "Content") are for informational and educational purposes only. The Content is not intended to be a substitute for professional medical advice, diagnosis, physical examination, or treatment. No Doctor-Patient Relationship: Reading the information on this website, submitting a contact form, or utilizing any online resources provided by this clinic does not establish a clinical professional-to-patient relationship between you and any practitioner at this clinic. Seek Professional Advice: Always seek the advice of your chiropractor, physiotherapist, primary care physician, or other qualified healthcare provider with any questions you may have regarding a medical or musculoskeletal condition, spinal concern, or treatment plan. Never disregard professional medical advice or delay seeking clinical care because of something you have read or accessed through this website. Emergency Situations: If you are experiencing a medical emergency, acute severe pain, or neurological changes (such as sudden numbness, loss of bowel/bladder control, or severe weakness), please contact your local emergency services (000 in Australia) immediately or present to the nearest hospital emergency department. Limitation of Liability: While our clinical team strives to keep the information on this site accurate, up-to-date, and evidence-based, medical knowledge constantly evolves. This clinic and its practitioners assume no liability for any injury, loss, or damage resulting from the use or reliance upon the information provided on this website

bottom of page